Platform Eng
— Week of Mar 10

What shipped, what's moving, and one decision we need from the room before the Birchline 2.4 cut.

Shipped this week

Three things out the door

In progress

Carrying into next week

Metrics

Numbers we watch

API p95 latency
184ms
↓ 12% wk/wk
Background job error rate
0.21%
↓ 0.08pp
p95 latency, trailing 8 days — lower is better
Decision needed

One call to make

Do we ship recurring tasks behind a workspace flag in 2.4, or hold one more week for the timezone fixes?

Flagged rollout gets it to design partners Friday but means two code paths for ~2 weeks. Holding keeps a single path but slips the partner promise.

A — Flag it, ship Friday B — Hold for 2.5
Next week

On deck

Questions → drop them in the platform channel or grab anyone after standup.
1 / 6